|
Post by wilful on May 8, 2012 15:44:34 GMT 9.5
|
|
|
Post by jagdish on May 14, 2012 0:36:51 GMT 9.5
I think that was an estimate of building PHWR in other countries. Costs in India are lower. 2000MW Kudankulam is likely to be built for Rs15,000 Cr ($3 Billion ). Est1mate of 500MW PFBR stands at $650 Million. Both are FOAK for India. Costs of future fast reactors could fall unless there is a general increase in construction costs. Chinese may be building at even lower cost/MW.
|
|